Some Executed Projects

PROJECT

Construction of Delta – Port Harcourt 300KV Double Circuit Transmission Lines (Lot 2011)

DATE

2011

CLIENT

Power Holding Company of Nigeria PHCN

STATUS

On-Going

PROJECT

Engineering Design Manufacture supply Installation and commission of Kumbotso (Daura – Dambatta 132KV Double Circuit Transmission Line Lot 2010 -6

DATE

2012

CLIENT

Power Holding Company of Nigeria PHCN

STATUS

On-Going

PROJECT

Construction of Perimeter Blockwall Fence at Ajaokuta 330/132kv Substation

DATE

2012

CLIENT

Power Holding Company of Nigeria PHCN

STATUS

Completed

PROJECT

Extension of 4.5KM 330KVA Overhead Line and Installation of 2×2.5MV A 33/11KV transformer at
Bauchi Market, Abuja

DATE

2012

CLIENT

Bauchi state Gov’t.

STATUS

Completed

PROJECT

Design and Installation of 5.2KM Overhead 330KV Double Circuit Tower from Dutse Substation to Karmo District injection Substation

DATE

2013

CLIENT

S.C.C Nig. LTD

STATUS

Completed

PROJECT

Construction of  Kumbotso (DAURA) – Dambata 132KV D Transmission Line

DATE

2013

CLIENT

ICOMM TELE LTD.

STATUS

Completed

PROJECT

Construction of Delta- Port Harcourt  1330KV Double Circuit Transmission Line

DATE

2011

CLIENT

ICOMM TELE LTD.

STATUS

Completed

Our Other Projects
  •  Rural Electrification from Bauchi to Toro Local Govt. Area
  •  Rural Electrification from Bauchi to Gombe Capital
  •  Rural Electrification from Kaba (Kogi State) to Lokoja
  •  Rural Electrification from Kwara state to Ogbona Local Govt. Area